Installation, Connections – NORD Drivesystems TI 278910140 User Manual

Page 2

Advertising
background image

Control box – SK POT1-2

2

TI 278910140 - 3313

Installation

The control box is designed as a handheld version, but it can also be permanently installed in the
vicinity of the frequency inverter.

Installation location

Wall surface near to the inverter

Mounting

4 screws on the mounting surface (fastening material not included in the scope of
delivery)

1.

Unscrew the screws on the front side and remove the cover.

2.

Mount the lower section of the housing at the required location with
suitable fastening material.

Spacing of the fastening holes:

X-axis (horizontal):

approx. 106.5 mm

Y-axis (vertical):

approx. 66.5 mm

3.

Reassemble the control unit and fasten it to the lower section of the
housing using the 4 screws (pay attention to the seal).

Pos : 4 /T ec hnis che Inf or mationen/ Bedi enboxen [SK POT 1-.. .]/ Anschl üss e [SK POT 1-... ] @ 3\ mod_1367912341490_388.doc x @ 64681 @ 5 @ 1

Connections

The control box is designed for
permanent connection to the frequency
inverter. For this, the open cable ends
of the control box must be connected
directly to the appropriate terminals of
the frequency inverter. If there is a cable
shield (not SK POT1-1), this must be
connected to the Analog Ground
(AGND) of the frequency inverter. If
necessary, use double wire end
sleeves.

Pos : 5 /T ec hnis che Inf or mationen/ Bedi enboxen [SK POT 1-.. .]/ Sc hnit tst ellen Fr equenz umrichter [SK POT 1- x] @ 3\ mod_1367913796919_388. doc x @ 64756 @ 5 @ 1

Advertising