3.0 Installation

3.1

Requirements on Site

All system parts are accessible from front or top of UPS. Cable entries are accessible from
bottom. A 1m free space on all sides should be allowed during installation. Once the system is
installed it may be placed close to walls as long as free space is allowed for system doors to open.
(Per applicable national and/or local codes.)

For ventilation and service purposes allow for free space of minimum 1m above the unit or per
national and/or local codes and in front of UPS. Never install systems in direct sunlight.

3.1.1 Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table:

* H is 1500 mm for optional IP31 cabinets

* BP I = Battery Pack I = 1 x 64 x 7 Ah batteries
** BP II = Battery Pack II = 1 x 64 x 24Ah batteries
*** BP III = Battery Pack III = 1 x 64 x 38 Ah batteries

Cabinets

NOTICE!

For reliability reasons do not stand on the UPS. keep the UPS cabinet surface free of any objects.

Width

Without

Batteries

[mm]

Width With Built-in Batteries

[mm]

Width for Separate

Battery Cabinets

[mm]

UPS

1xBP I*

2xBP I*

3xBP I*

1xBP II**

1xBP III***

60kW

800

1x800

1x1000

80kW

800

1x800

1x1000

800 mm wide

60-80kW

1400 mm

APC Isolation

10-80kW

Battery cabinet

for 1xBP ll

1400 mm

1000 mm wide

Battery cabinet

for 1xBP lll

1400 mm

600 mm wide

800 mm wide

Transformer module