ADIC SNC 5100 User Manual

Page 82

Advertising
background image

SNC 5100

74

Ethernet MAP

6-00020-02

Step 23.

Remove the Ethernet cable from the SNC 5100 and install the
Ethernet loop back plug.

Step 24.

From the service terminal, enter the

diagBoot

command.

For more information, see “Entering Diagnostic Mode” on
page 187.

Step 25.

Wait for the SNC 5100 to finish booting.

Step 26.

Verify that the

diagmode>

prompt is displayed.

Step 27.

From the service port, enter the

elTest

command.

Example:

diagmode > elTest

==== Testing Ethernet ====

Init complete.

Ethernet OK

value = 0 = 0x0

Step 28.

If the test fails, replace the SNC 5100.

Go to “Before Removing or Replacing the Unit” on page 82.

Continue through “Replacing the SNC 5100” on page 84.

Exit this MAP.

If the test passes, remove the Ethernet loop back plug.

Proceed to Step 29.

Step 29.

From the service terminal, enter the

normalBoot

command and

wait for the SNC 5100 to finish booting.

Step 30.

Reattach the Ethernet cable to the SNC 5100.

Step 31.

From the service terminal, enter the

gateAddrGet

command and

write down the network gateway address that is displayed.

For more information, see the

"gateAddrGet"

command on page

131.

Step 32.

Compare this address to the one provided by the network
administrator.

Advertising