Installing hardware options, Setting up a tower server – HP ProLiant ML350 G6 Server User Manual

Page 34

Advertising
background image

Setup 34

•

Rack-mounting hardware

In addition to the supplied items, you may need:

•

T-15 Torx screwdriver

•

Hardware options

•

Operating system or application software

•

PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page

37

)."

Setting up a tower server

Follow the steps in this section to set up a tower model server. If you are going to install the server into a rack,

refer to the rack installation ("

Installing the server into the rack

" on page

35

) section.

1.

Install the feet.

2.

Return the server to an upright position.

3.

Connect peripheral devices to the server ("

Rear panel components

" on page

9

).

WARNING:

To reduce the risk of electric shock, fire, or damage to the equipment, do not plug

telephone or telecommunications connectors into RJ-45 connectors.

4.

Connect the power cord to the rear of the server.

5.

Connect the power cord to the AC power source.