HP ProLiant ML350 G6 Server User Manual

Page 86

Advertising
background image

Hardware options installation 86

o

Extend the server from the rack (on page

24

).

4.

Locate the TPM connector ("

System board components

" on page

11

).

CAUTION:

Any attempt to remove an installed TPM from the system board breaks or disfigures

the TPM security rivet. Upon locating a broken or disfigured rivet on an installed TPM,
administrators should consider the system compromised and take appropriate measures to ensure

the integrity of the system data.

5.

Install the TPM board. Press down on the connector to seat the board ("

System board components

" on

page

11

).

6.

Install the TPM security rivet by pressing the rivet firmly into the system board.

7.

Install the access panel (on page

27

).

8.

Do one of the following:

o

Close or install the tower bezel, as needed.

o

Slide the server back into the rack.

9.

Power up the server (on page

24

).

Advertising