HP ProLiant ML350 G6 Server User Manual

Page 88

Advertising
background image

Hardware options installation 88

In addition to the supplied items, you may need:

T-10 Torx screwdriver

T-15 Torx screwdriver

To convert a tower server to a rack server:

1.

Power down the server (on page

24

).

2.

Disconnect all rear panel cabling ("

Rear panel components

" on page

9

).

3.

Remove the tower bezel ("

Open or remove the tower bezel

" on page

25

).

4.

Remove the feet.

5.

Remove both tower configuration panels:

a.

Using the T-10 Torx screwdriver, remove the front panel screws.

b.

Unhook the tower configuration panels from the chassis.

Advertising