HP Hitachi Dynamic Link Manager Software User Manual

Page 57

Advertising
background image

2. HDLM Functions

33

Offline operation: Offline operation performed in the Path Management window

or by executing the

dlnkmgr

command's

offline

operation.

#1

During reserve processing for an LU, the Online status is temporarily changed to

Online(P)

. When the reservation processing finishes, the

Online(P)

status is

changed to

Offline(C)

.

#2

When the following conditions are satisfied, the connected

Offline(C)

paths

are automatically placed online:

• All the online paths are

Online(E)

and all the SCSI devices connected to

the

Online(E)

paths have been deleted.

• SCSI devices are connected and all the

Offline(E)

paths are subject to

automatic failback.

• SCSI devices are connected to the

Offline(C)

paths.

#3

When a path is added dynamically, initially the path status is

Offline(C)

. The

path status will then automatically change to

Online

. For details on dynamically

adding a path, see 4.7.1 Setting Up an Added LU and Path as an HDLM

Management-target.

#4

When the following conditions are all satisfied, a path that has been determined

to have an intermittent error also becomes subject to automatic failback:

• All the paths connected to an LU are

Online(E)

,

Offline(E)

, or

Offline(C)

.

• All the paths connected to an LU have been determined to have an

intermittent error.

• The processing of continuous I/O operations issued to an LU is successful.

#5

During reserve processing for an LU, the

Offline(E)

status is temporarily

changed to

Offline(P)

. After the reserve processing finishes, the

Offline(P)

status is changed to

Offline(C)

.

#6

When the following conditions are satisfied, the connected

Offline(E)

paths

are automatically placed online:

• All the online paths are

Online(E)

and all the SCSI devices connected to

Advertising