Caution, Installation preparation, Prepare hot water line – GE PDT750SSFSS User Manual

Page 5: Water line connection, Turn page to begin dishwasher installation

Advertising
background image

PREPARE HOT WATER LINE

NOTE: GE recommends copper tubing for the water line, but if
\RXFKRRVHWRXVHÀH[LEOHKRVHXVH*(·VWX28X326ÀH[LEOH

braided hose.
• The water supply line (3/8” copper tubing or flexible braided

hose) may enter from either side, rear or floor within the
shaded area shown in Figure F.

• The water supply line may pass through the same hole as the

electrical cable and drain hose. Or, cut an additional 1-1/2"
diameter hole to accommodate the water line. If power cord
with plug is used, water line must not pass through power
cord hole.

Figure F

Water Line Connection

• If using a flexible braided supply hose, label the hose with the

installation date to use as reference. Flexible braided hoses
should be replaced in 5 years.

• Turn off the water supply.
• Install a hand shut-off valve in an accessible location, such

as under the sink. (Optional, but strongly recommended and
may be required by local codes.)

• Water connection is on the left side of the dishwasher. Install

the hot water inlet line, using no less than 3/8" copper tubing
or a flexible braided hose. Route the line as shown in Figure F
and extend forward at least 19" from rear wall.

• Adjust water heater for 120°F to 140°F temperature.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.

Turn page to begin dishwasher installation.

6"

4"

Cabinet Face

Shut-off

Valve

2" From Floor

19" From Wall

2"

From

Cabinet

1-1/2" Dia.

Hole

Hot

Installation Preparation

5

CAUTION:

Do not remove wood base until you are ready to install the

dishwasher. The dishwasher will tip over when the door is

opened if base is removed.

Advertising