Dishwasher installation, Important, Step 3: remove wood base, install leveling legs – GE PDT750SSFSS User Manual

Page 6: Step 1: preparation, Step 4: remove toekick

Advertising
background image

Sound Barrier

Bottom Front View

Tape

NOTE: If installing a Cus-
tom Door Panel (available
on some models), please
follow the instructions
found in the Custom
Door Panel kit.
• With dishwasher on

the wood base, check

the door balance by

opening and closing

the door.

• Door is properly

balanced if, when

opened, it self closes within 20° from vertical, stays in position

from 20° to 70° and falls fully open beyond 70°.

• If necessary increase or decrease tension as shown. Some

models will have 1 spring on each side and other models will

have 2 springs on one side and 1 spring on the other side.

Latch door and adjust springs to correct balance.

Dishwasher Installation

• Screw leveling legs back into the dishwasher frame,

approximately 1/2" from frame as shown.

NOTE: Some models have rear adjustable leveling wheels, and
will not require the 2 rear leveling legs.

Approx.

1/2"

STEP 3: REMOVE WOOD BASE,

INSTALL LEVELING LEGS

IMPORTANT

'RQRWNLFNRȺZRRGEDVH

Damage will occur.

• Move the dishwasher close to the installation location and lay

it on its back.

• Remove the 4 leveling legs on the underside of the wood base

with a 15/16" socket wrench.

• Discard base.

STEP 1: PREPARATION

Locate the items in the installation package:
• Screws
• Junction box cover
• Drain hose and clamp
• Mounting brackets
• Trim pieces (on some models)
• Drain hose hanger
• Owner's Manual
• Product samples and/or coupons

Figure I

To

ekick

Remove 2

Toekick Screws

STEP 4: REMOVE TOEKICK

• Remove the 2 toekick screws and toekick. Set aside for use in

Step 24.

Figure J

6

Tip: Make sure door opens and closes smoothly.
Check door opening and closing. If door does not open easily or
falls too quickly, check spring cable routing. The cable is held in
place by “shoulders” on the pulley. Check to be sure cable has
not slipped over the pulley shoulders and is routed as shown.

STEP 2: CHECK DOOR BALANCE

STEP 5: POSITION SOUND BARRIER

(on some models)

Skip this step if the sound
barrier is not assembled
to the dishwasher.
Lift the sound barrier and
tape to the door front with
masking tape. This will
hold the sound barrier up
and out of the way during
installation.

Figure G

Door

closes

within

20°

Door stays in

position from

20° to 70°

Door falls fully

open beyond 70°

Side View

Figure K

Side View

Make sure pulley cables

are within pulley shoulders

Front View

Custom
door
panel

Spring

hooked

to screw

inside leg

Increase

Tension

Decrease

Tension

Figure H

Advertising