Installation preparation, Caution, Water line connection – GE ZDT800SSFSS User Manual

Page 6

Advertising
background image

Water Line Connection

If using a flexible braided supply hose, label the hose

with the installation date to use as reference. Flexible
braided hoses should be replaced in 5 years.

• Turn off the water supply.
• Install a hand shut-off valve in an accessible location,

such as under the sink. (Optional, but strongly
recommended and may be required by local codes.)

• Water connection is on the left side of the dishwasher.

Install the hot water inlet line, using no less than 3/8”
copper tubing or a flexible braided hose. Route the line
as shown in Figure F and extend forward at least 19”
from rear wall.

• Adjust water heater for 120°F to 140°F temperature.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.

Turn page to begin dishwasher installation

.

Installation Preparation

35(3$5(+27:$7(5/,1(

NOTE: GE recommends copper tubing for the water
line, but if you choose to use flexible hose, use GE’s
WX28X326, flexible braided hose.

The water supply line (3/8” copper tubing or flexible

braided hose) may enter from either side, rear or floor
within the shaded area shown in Figure F.

• The water supply line may pass through the same

hole as the electrical cable and drain hose. Or, cut an
additional 1-1/2" diameter hole to accommodate the
water line. If power cord with plug is used, water line
must not pass through power cord hole.

Figure F

6"

4"

Cabinet Face

Shut-off
Valve

2" From Floor

19" From Wall

2"

From

Cabinet

1-1/2" Dia.

Hole

Hot

CAUTION:

Do not remove wood base until you are ready to install

the dishwasher. The dishwasher will tip over when the

door is opened if base is removed.

6

Advertising
This manual is related to the following products: