Dishwasher installation, Remove toekick, Step 1 preparation – GE ZDT800SSFSS User Manual

Page 7: Step 3 remove wood base, install leveling legs, Step 2, Position sound barrier (on some models), Step 4 step 5

Advertising
background image

REMOVE TOEKICK

• Remove the 2 toekick screws and toekick. Set aside for

use in Step 24.

STEP 1 PREPARATION

Locate the items in the installation package:

• Screws

• Junction box cover
• Drain hose and clamp
• Mounting brackets
• Trim pieces (on some models)
• Drain hose hanger
• Owner’s Manual
• Product samples and/or coupons

Dishwasher Installation

STEP 3 REMOVE WOOD BASE,

INSTALL LEVELING LEGS

IMPORTANT –

Do not kick off wood base!

Damage will occur.
• Move the dishwasher close to the installation location

and lay it on its back.
• Remove the 4 leveling legs on the underside of the

wood base with a 15/16” socket wrench.
• Discard base and 2 leveling legs.
• Screw front 2 leveling legs back into the dishwasher

frame, approximately 1/2” from frame as shown.

NOTE: The dishwasher has rear adjustable leveling
wheels, and will not require the 2 rear leveling legs.

STEP 2

&+(&.'225%$/$1&(

NOTE: If installing a
Custom Door Panel
(available on some
models), please follow
the instructions found in
the Custom Door Panel
kit.
• With dishwasher on

the wood base, check

the door balance by

opening and closing

the door.

• Door is properly

balanced if, when opened, it self closes within 20° from

vertical, stays in position from 20° to 70° and falls fully

open beyond 70°.

• If necessary increase or decrease tension as shown.

Some models will have 2 springs on one side and 1

spring on the other side. Latch door and adjust springs

to correct balance.

Tip: Make sure door opens and closes smoothly.
Check door opening and closing. If door does not open

easily or falls too quickly, check spring cable routing. The

cable is held in place by “shoulders” on the pulley. Check

to be sure cable has not slipped over the pulley shoulders

and is routed as shown.

Side View

Make sure pulley cables

are within pulley shoulders

Front View

Custom
door
panel

Spring

hooked

to screw

inside leg

Increase

Tension

Decrease

Tension

)LJXUH+

Approx.

1/2"

Figure I

Figure J

Sound Barrier

Bottom Front View

Tape

POSITION SOUND BARRIER

(on some models)

Skip this step if the

sound barrier is not

assembled

to the dishwasher.
Lift the sound barrier
and tape to the door
front with masking
tape. This will hold the
sound barrier up and
out of the way during
installation.

Figure K

STEP 4

STEP 5

7

Figure G

Door

closes

within

20°

Door stays in

position from

20° to 70°

Door falls fully

open beyond 70°

Side View

Figure G

Toekick

Remove 2

Toekick Screws

Advertising
This manual is related to the following products: