Installing the new water heater (cont’d) – State PR6 40 NHDST2 User Manual

Page 13

Advertising
background image

13

Installing the New Water Heater (cont’d)

MANUFACTURED HOME INSTALLED OVER A BASE-

MENT OR CRAWLSPACE – AIR INTAKE THROUGH AN

OUTSIDE WALL

ALL 30 AND 40 GALLON MODELS

3

″ PVC Schedule 40 intake air vent piping:

Optional Kit No. 9002986 contains a 3

″ PVC Schedule

40-45° vent cap with screen and two 3

″ wall collars.

ALL 50 GALLON MODELS

4

″ PVC Schedule 40 intake air vent piping:

Optional Kit No. 9002987 contains a 4

″ PVC Schedule

40-45° vent cap with screen and two 4

″ wall collars.

ALL MODELS

1. PVC, ABS or CPVC Schedule 40 piping and fittings are

acceptable materials for the intake air vent system.

2. The intake air vent system must terminate horizontally

to the outdoors.

3. Remove the screws which attach the wind baffle to the

existing metal air intake vent pipe underneath the

home. Discard the wind baffle and screws.

4. Attach a 3

″ or 4″ PVC street elbow to the metal air

intake vent using 3 sheet metal screws. Continue PVC

piping to outside wall and terminate with vent cap and

screen.

3

″ size - 30 and 40 gallon models

4

″ size - 50 gallon models

See page 14 for cementing instructions.

NOTE: Vent cap must be located a minimum of 12

″″

above the ground.

5. Vertical and horizonal runs must be securely support-

ed at 3

1

/

2

foot intervals.

REMOVE SCREWS AND WIND
BAFFLE AND DISCARD.

VENT

CAP

WITH

SCREEN

PVC SCHEDULE 40 PIPE

PVC

SCHEDULE

40 STREET

ELBOW

Advertising
This manual is related to the following products: