State GPO 69 700OE User Manual

Page 17

Advertising
background image

17

TWO TEMPERATURE - THREE HEATERS (TWO PRE-HEATERS/ONE BOOSTER)

WITH OR WITHOUT CIRCULATION

TWO TEMPERATURE - TWO HEATERS (ONE PRE-HEATER/ONE BOOSTER HEATER)

WITH OR WITHOUT RECIRCULATION

* PIPE RELIEF VALVE TO OPEN DRAIN

** 140°F (60°C) TO 150°F (65.5°C) SHOULD BE MAXIMUM WATER

TEMPERATURE MAINTAINED IN THE PRE-HEATERS.

120°F (48.8°C) SHOULD BE THE MINIMUM TEMPERATURE OF WATER

STORED IN THE PRE-HEATERS.

INSTALL IN ACCORDANCE WITH LOCAL CODES

DANGER:

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE TEMPERATURES AT FIXTURES. SEE WATER

TEMPERATURE CONTROL WARNING ON PAGE 10. IF HIGHER PREHEAT TEMPERATURES ARE

NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT, ADD AN ANTI-SCALD VALVE FOR HOT

WATER SUPPLIED TO FIXTURES.

INSET B

VACUUM RELIEF VALVE

INSTALL PER LOCAL CODES.

INSET A

INSTALL THERMAL EXPANSION

TANK IN COLD WATER SUPPLY

LINE, IF CHECK VALVE OR

PRESSURE REDUCING VALVE

IS USED IN SUPPLY.

WIRING DIAGRAM FOR FIXTURE OR BOOSTER

LOOP (IF USED) - OTHER THAN DISHWASHER

WIRING DIAGRAM FOR 180° LOOP (IF USED)

CONNECT CIRCULATING LINE FROM FIXTURES, IF USED, TO COLD WATER

SUPPLY LINE OF PRE-HEATER.
CONNECT CIRCULATING LINE OF 180°F OR BOOSTED WATER, IF USED, TO

INLET WATER LINE TO BOOSTER.

Advertising
This manual is related to the following products: