Operation, Power up action, 3 operation – Videoswitch CMOR Vi-D5000 Dome User Manual

Page 23: Vi-d5000 ir dome

Advertising
background image

Vi-D5000 IR Dome

Videoswitch Page

18

VD601A.DOC

3 Operation

3.1 Power Up Action

When initialising the system, the operation run in 2 seconds.

When restoring out-of-factory settings, please wait patiently. The
operation will run for 1 minute.

This left figure shows the initialising state of the pan/tilt motor of speed
dome camera.









The initialisation of pan/tilt motor is complete.

Dome firmware is now detecting camera module type and
initialising it.











Power up self-testing is complete.






IR CAMERA
PROTOCOL PELCO-D/P
COMM 2400.N.8.1
DOME ID

001

MODULE
VERSION V1.2
PAN MOTOR

OVER

TILT MOTOR

OVER


POWER ON

IR CAMERA
PROTOCOL PELCO-D/P
COMM 2400.N.8.1
DOME ID

001

MODULE FCB-EX980P
VERSION V1.2
PAN MOTOR

OVER

TILT MOTOR

OVER


POWER ON

IR CAMERA
PROTOCOL PELCO-D/P
COMM 2400.N.8.1
DOME ID

001

MODULE
VERSION V1.2
PAN MOTOR

INIT

TILT MOTOR

INIT


POWER ON

Advertising