Figures – Campbell Scientific CS110 Electric Field Meter User Manual

Page 7

Advertising
background image

CS110 Table of Contents

H. Tripod CS110 and StrikeGuard Site....................... H-1

H.1 Tripod CS110 and StrikeGuard .......................................................... H-1

H.1.1 Installation of the Tripod CS110 and StrikeGuard site ............. H-2
H.1.2 Determination of Csite .............................................................. H-7

Figures

1. CS110 Electric Field Meter ........................................................................1
2. Charge amplifier circuitry of reciprocating electric field meter .................7
3. Charge amplifier output during an electric field measurement cycle .........8
4. CS110 average current consumption versus measurement interval..........10
5. Parallel-plate electric field meter calibration chamber ..............................12
6. Factory calibration data for CS110 SN: 1026...........................................13
7. NIST calibration certificate ......................................................................14
8. CS110 2 Meter CM10 Tripod Site............................................................15
9. Campbell Scientific, Inc. electric field meter site correction facility........16
10. CS110 attached to upward-facing flush-mounted plate for site

correction ...........................................................................................17

11. Site correction data for CS110 2 Meter CM10 Tripod Site ....................18
12. Electric field measured with CS110 during local thunderstorm.............20
13. CS110 stator, shutter and sense electrode...............................................36
14. Inside of CS110 case illustrating bracket for holding desiccant.............38
D-1. Exploded View of CS110 Electric Field Meter................................. D-1
D-2. CS110 Motor Assembly .................................................................... D-5
E-1. CS110 slow antenna frequency response............................................E-2
E-2. KSC electric field and CS110 slow antenna data................................E-3
E-3. KSC electric field change and CS110 slow antenna data ...................E-4
G-1. CS110 2 Meter CM10 Tripod Site .................................................... G-1
G-2. CS110 on CM10 Tripod Mast ........................................................... G-3
G-3. Earth Grounding ................................................................................ G-4
G-4. Determination of Csite ...................................................................... G-5
H-1. Tripod CS110 and StrikeGuard......................................................... H-1
H-2. CS110 and StrikeGuard on Tripod Mast ........................................... H-3
H-3. Grounding the CS110 Grounding Strap ............................................ H-4
H-4. Grounding the Tripod and Battery .................................................... H-5
H-5. Connections for Combined System ................................................... H-6
H-6. Determination of Csite ...................................................................... H-7

iii

Advertising