Installation overview – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual

Page 34

Advertising
background image

Chapter 2: Installing the Hardware

34

Installation Overview

Table 7 lists the installation procedures for a stack of the AT-9424Ts,
AT-9424Ts/XP, and AT-9448Ts/XP Switches. The procedures, which are
divided into four chapters, should be performed in the order presented in
the table. Allied Telesis recommends that you print this table and place a
check mark beside the procedures as you complete them.

Table 7. Installation Procedures

Step

Procedure

Chapter 2, “Installing the Hardware”

1

Refer to “Reviewing the Safety Precautions” on
page 36

2

Refer to “Planning the Installation of a Stack” on
page 38

3

Refer to “Maximum Number of Switches in a
Stack” on page 39

4

Refer to “Unpacking a Switch” on page 40

5

Refer to “Installing the AT-StackXG Stacking
Module” on page 41

6

Refer to “Installing the Power Cord Retaining Clip
(AC Switches Only)” on page 44

7

Refer to “Disconnecting the Network Cables” on
page 45

8

Refer to “Installing the Switches in an Equipment
Rack” on page 46

9

Refer to “Labeling the Switches” on page 48

Chapter 3, “Preparing the Switches”

10

Refer to “Powering on a Switch” on page 50

11

Refer to “Starting a Local Management Session”
on page 52

12

Refer to “Verifying the AT-S63 Version Number”
on page 54

13

Refer to “Updating the AT-S63 Management
Software” on page 55

14

Refer to “Assigning the Static Module ID Number
1 to the Master Switch” on page 56

Advertising
This manual is related to the following products: