Chapter 4, Cabling and powering on the stack, Chapter 4 cabling and powering on the stack – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual
Page 61: Chapter 4, “cabling and powering on the stack
Advertising

61
Chapter 4
Cabling and Powering on the Stack
The chapter contains the following procedures:
“Cabling the AT-StackXG Stacking Modules” on page 62
“Powering On the Switches of the Stack” on page 65
“Verifying the Installation” on page 67
Advertising
This manual is related to the following products: