Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual
Page 47
Advertising

AT-9400Ts Stack Installation Guide
47
5. Install the second rack-mount bracket on the other side of the switch
with the four remaining screws.
6. Mount the switch in a 19-inch rack using standard screws (not
provided), as shown in Figure 17.
Figure 17. Mounting the Switch in a Rack
After you have installed all the switches of the stack in the equipment rack,
you are ready to label the switches, as explained in the next procedure.
940
8LC
/SP
Gig
abit Eth
ernet
Sw
itch
FAULT
MASTER
RPS
POWE
R
EJECT
STAT
US
TERMINAL
PORT
L/A
Advertising
This manual is related to the following products: