Chapter 3, Installing the switch – Allied Telesis AT-8324 User Manual

Page 39

Advertising
background image

39

Chapter 3

Installing the Switch

This chapter describes the following installation procedures:

# Verifying the Package Contents

# Reviewing Safety Precautions

# Selecting a Site for the Switch

# Installing the Switch as a Standalone Unit

# Installing the Switch in a Rack

# Building a Stack of Two Switches

# Building a Stack of Three Switches

# Building a Stack of Four to Eight Switches

# Setting Up a Terminal for Local Management

# Modifying an Existing Stack

# Installing an Expansion Module

Advertising
This manual is related to the following products: