Chapter 3, Installing the switch – Allied Telesis AT-8324 User Manual
Page 39
Advertising
39
Chapter 3
Installing the Switch
This chapter describes the following installation procedures:
# Verifying the Package Contents
# Reviewing Safety Precautions
# Selecting a Site for the Switch
# Installing the Switch as a Standalone Unit
# Installing the Switch in a Rack
# Building a Stack of Two Switches
# Building a Stack of Three Switches
# Building a Stack of Four to Eight Switches
# Setting Up a Terminal for Local Management
# Modifying an Existing Stack
# Installing an Expansion Module
Advertising
This manual is related to the following products: