Installation, Desktop installation, Surface mount installation – ADC Network Unit User Manual

Page 13: Chapter 2: installation -1, Chapter 2: installation, 2chapter, Nstallation

Advertising
background image

AIWN-UM-7001-01

2-1

2

Chapter

I

NSTALLATION

When using the mounting bracket, allow six inches (15.3 cm) on both ends of the ENIU for cable access. Install the
ENIU using the following procedures.

D

ESKTOP

I

NSTALLATION

S

URFACE

M

OUNT

I

NSTALLATION

An optional ENIU mounting bracket provides a number of options when securing the ENIU to a vertical or horizontal
surface. An ENIU can be installed facing up, down, right, or left when mounted on a vertical surface. The same
mounting bracket is also used to secure the ENIU to the bottom of a work surface.

Step

Action

1

Remove the protective adhesive backing from the four feet. Position a foot on each bottom corner of the
ENIU. Press these firmly onto the ENIU.

2

Situate the ENIU in a way that provides both front and rear access. LEDs and Ethernet connections are
located on both ends. Power connection is located on the rear panel.

3

Connect the power supply to the DC IN connector located on the back of the ENIU:

– If using AC power, connect the power supply to the AC source (110 – 240 VAC, 50 – 60 Hz).

– If using DC power, connect the power following local practices. (See

“Power and Ground

Connections” on page 2-2

.) See

Appendix A: Specifications

for fuse size.

4

Verify that the STATUS LED is lit.

DANGER

Infrared radiation is invisible and can seriously damage the retina of the eye. Do not look into the
optical connector of an operational transmitter, or into the end of an active fiber. A clean,
protective cap or hood MUST be immediately placed over any radiating connector or optical fiber
to avoid exposure to potentially dangerous amounts of radiation. This practice also helps prevent
contamination of connectors and adapters. Do not assume laser power is turned off or the fiber
is disconnected at the other end.

Note:

Allow six inches (15.3 cm) on both ends of the ENIU for cable access.

Step

Action

1

Situate the ENIU in a way that provides both front and rear access. LEDs and Ethernet connections are
located on both ends. Power connection is located on the rear panel.

2

Using the mounting bracket as a template, mark and drill holes in the mounting surface.

3

Secure the mounting bracket to the surface with appropriate fasteners for the surface material (#10 wood
screws or machine screws depending on the mounting surface).

4

Align the slots on the rear face of the ENIU with the mounting bracket. See

Figure 2-1

. Slide the ENIU

into the mounting bracket.

5

If not already installed, insert SFP into ENIU until you hear it click in place.

Advertising