Vertical contact toaster, Maintenance (continued) – A.J. Antunes & Co VCT-2000 9210214 User Manual
Page 14
VERTICAL CONTACT TOASTER
14
P/N 1010874 Rev. I 04/14
Weld
Screws
Acorn Nuts
Spacers
Tensioner
Assy.
Tape
Figure 12. Replacing the Roller Tensioner
Checking the Roller Tensioners
(Every 3–6 months)
MEASURING THE ROLLER TENSIONERS
1. Measure the Roller Tensioner on both inner
Conveyor Covers (Figure 11) using a U.S. Nickel.
2. The space between the inner Conveyor Cover
and the bottom of the Tensioner wheel should be
13/16” (2.1 cm) or the height of a U.S. Nickel.
3. Adjust or replace any damaged ones as
recommended.
REPLACING ROLLER TENSIONERS
1. Remove the acorn nuts and old Roller Tensioner
assembly (Figure 12).
2. Replace the Roller Tensioner assembly, and
reassemble.
3. Make sure the spacers are placed inside the
Tensioner arm. The spacers are smaller than the
holes to allow the Tensioner to pivot freely.
MAINTENANCE (continued)
Figure 11. Measuring the Roller Tensioner