Baseplate-mounting procedures, Prepare the baseplate for mounting – Goulds Pumps 3600 - IOM User Manual

Page 20

Advertising
background image

Installation

• Provide a flat, substantial concrete foundation in order to prevent strain and distortion

when you tighten the foundation bolts.

• Sleeve-type and J-type foundation bolts are most commonly used. Both designs allow

movement for the final bolt adjustment.

Sleeve-type bolts

1. Baseplate
2. Shims or wedges
3. Foundation
4. Sleeve
5. Dam
6. Bolt

J-type bolts

1. Baseplate
2. Shims or wedges
3. Foundation
4. Dam
5. Bolt

Baseplate-mounting procedures

Prepare the baseplate for mounting

This procedure assumes you have a basic knowledge of baseplate and foundation design and
installation methods. Follow industry-standard procedures, such as API RP 686/ PIP REIE 686,
or this procedure before you grout the baseplate.
1. Make sure that all baseplate surfaces that will contact grout are free from contamination

such as rust, oil, and grime.

2. Thoroughly clean all baseplate surfaces that will come in contact with grout.

Make sure to use a cleaner that will not leave residue.

18

Model 3600, API 610 8th, 9th, 10th & 11th Editions (ISO 13709) Installation, Operation, and Maintenance Manual

Advertising