Installation and operation checklist, Model af – Goulds Pumps AF (Axial Flow) (6"-36) MXR Bearings" User Manual

Page 16

Advertising
background image

14

AF (6-36) IOM

INSTALLATION AND OPERATION CHECKLIST

Model AF

COMPLETE INITIAL DESCRIPTION

PAGE NO.

Manual read and understood

1~69

Level

foundation

15

Level subbase

15 ~ 19

Check motor rotation ---CW ---CCW

29

Component rough alignment complete

21 ~ 28

V-belt tension and alignment per drive mfgr. 21

Coupling alignment per cplg mfgr.

23

Piping installed and alignment rechecked

21,22,36

Mech. seal adjusted per mfgr.

Mfgrs Mnl

Seal flush connected

33,34

Impeller alignment and clearance set

Inch/Side 26 ~ 28

Pump shaft-free turning

32

Bearing types and lubrication

12,32,39

V-belt

or

coupling guards installed

60,61

Motor electrical connections

Mfgrs Mnl