Stuffing box installation – Goulds Pumps API 3171 - IOM User Manual
Page 22
Figure 4: Layout for a standard support plate with the vapor-proof option
4. Hand tighten the anchor bolts. Check the level and re-shim if necessary.
5. Tighten all anchor bolts in a star pattern in order to avoid distorting the support plate.
Stuffing box installation
This pump is a sealless design. Therefore, when temperatures exceed 180°F (82°C), you must move the
thrust bearing away from the heat source in the pump by adding the upper stuffing box. Air can then
circulate around the bearing in order to keep it cool.
The upper stuffing box is also used to minimize vapor emissions when the pump handles controlled
substances.
2
3
6
9
8
7
5
4
1
1. Motor support
2. Upper stuffing box
3. Gasket
4. Discharge pipe
5. Support plate
6. Gasket
7. 3 in. (76.2 mm) NPT female connection
8. Pit cover
9. Gasket
Installation
20
Model API 3171 Installation, Operation, and Maintenance Manual