Cv 3171 installation and operation checklist – Goulds Pumps CV 3171 - IOM User Manual

Page 14

Advertising
background image


14

CV 3171 IOM 05/11

 

UNCRATING/DESKIDDING


Care should be taken when uncrating or
deskidding pumps. If shipment is not delivered in
good order, and in accordance with the bill of

lading, note the damage or shortage on both the
receipt and freight bill.

Make any claims to the transportation company
promptly. Instruction sheets as well as the
instruction book for the pump are included in the
shipment.






CV 3171 Installation and Operation Checklist

COMPLETE INITIAL

DESCRIPTION

SECTION NO.

Installation Manual Received and Read

ALL

Level Pit Opening

3

Level Support Plate

3

Check Motor Rotation ---CW ---CCW

3

Install Coupling

3

Rough Alignment Completed

3

Piping Installed and Alignment Rechecked

3

Flush or Grease Piping Connected

4

Impeller Clearance Set ______ Inch

4,5

Pump Shaft-Free Turning

4

Float Controls Understood

4

Bearing Types and Lubrication

4

Coupling Guard Installed

4

Discharge Valve Partially Open

4