Goulds Pumps VIT - IOM User Manual
Page 53
Advertising

Check
Complete
Watch for signs of trouble. The unit must run at least ten minutes in order to flush out the pump and system.
Verify that the unit runs smoothly with no unusual noise, vibration, or over heating.
Run the unit for one hour in order to test the system.
Measurements
Reading
Value
Impeller lift
Shaft runout
Megger
Vibration
Installation (Continued)
Model VIT Installation, Operation, and Maintenance
51
Advertising
See also other documents in the category Goulds Pumps Pumps:
- 3100 - IOM (52 pages)
- 3171 - IOM (60 pages)
- 3180-86 - IOM (158 pages)
- 3189 - IOM (32 pages)
- 3196 - IOM (148 pages)
- 3196 i-FRAME - IOM (152 pages)
- 3198 i-FRAME - IOM (126 pages)
- 3296 EZMAG - IOM (96 pages)
- 3296M - IOM (92 pages)
- 3298 - IOM (120 pages)
- 3311 - IOM (44 pages)
- 3316 - IOM (36 pages)
- 3335 - IOM (40 pages)
- 3355 - IOM (66 pages)
- 3393 - IOM (124 pages)
- 3408 - IOM (78 pages)
- 3408A - IOM (44 pages)
- 3409 - IOM (68 pages)
- 3410 - IOM (56 pages)
- 3420 - IOM (120 pages)
- 3498 - IOM (59 pages)
- 3500XD - IOM (44 pages)
- 3501 Mixer - IOM (48 pages)
- 3600 - IOM (110 pages)
- 3610 - IOM (98 pages)
- 3620 - IOM (98 pages)
- 3640 - IOM (98 pages)
- 3642 - IOM (12 pages)
- 3675 - IOM (12 pages)
- 3700 - IOM (110 pages)
- 3755 - IOM (32 pages)
- 3796 i-FRAME - IOM (134 pages)
- 3910 11th ed. - IOM (80 pages)
- 3935 - IOM (24 pages)
- 3996 - IOM (52 pages)
- 4550 - IOM (36 pages)
- 5000 - IOM (24 pages)
- 5100 - IOM (28 pages)
- 5150 - IOM (28 pages)
- 7200CB - IOM (132 pages)
- ANSI FAMILY IOM (ATEX Compliant) (56 pages)
- ANSI FAMILY IOM (ATEX Compliant) (27 pages)
- ANSI FAMILY IOM (ATEX Compliant) (42 pages)
- ANSI FAMILY IOM (ATEX Compliant) (45 pages)
- Pump Safety (9 pages)