Small Power Substation Transformers

16

Gaskets

Visually check all gaskets for cracking or other signs of

deterioration. Replace as necessary. When replacing

a gasket carefully clean mating surfaces to remove

any rust, dirt, transformer fluid, old gasket material, or

other contamination that might prevent a good seal.

Use an appropriate gasket cement when installing new

gaskets. Do not reuse old gaskets. Six months after

replacing a gasket, check and retighten if necessary.

Additional Maintenance Instructions

Contact the Howard Substation Transformer Division for

additional maintenance instructions.

Repair Parts

Repair parts can be ordered from the Howard

Substation Transformer Division. A description of the

part and the transformer serial number will be required

to ensure that the correct part has been ordered.

Warranty Claims

The Howard Substation Transformer Division should

be notified immediately when problems are discovered

during the warranty period. All warranty repairs must

be made or approved by the Howard Substation

Transformer Division.