Burnham MPC User Manual
Page 42
 
c. BSD with right hand hinge arrangement -
harness	exits	right	side	of	jacket	front	panel	en	
route	to	control	panel.
d. BSD with right hand hinge arrangement -
harness	exits	left	side	of	jacket	front	panel	en	
route	to	control	panel.
Locate	two	(2)	cable	clamps	and	secure	harness	to	
vertical	rails	with	two	(2)	#8	x	½	hex	head	sheet	
metal	screws	as	shown	in	Figure	24g,	clamp	must	be	
facing	inward	to	prevent	interference	with	jacket.
7. Adjust length of internal wiring harness to match
boiler size, see Table IX and Figure 25 for details.
a. 4 thru 8 section boilers are shipped with the
internal	harness	length	suitable	for	an	8	section	
boiler.		To	modify	harness	for	a	7	section,	cut	
nylon	wire	tie	A;	for	a	6	section,	cut	A	&	B;	for	5	
section,	cut	A,	B	&	C;	and	for	a	4	section,	cut	A,	
B,	C	&	D.		Refer	to	Table	IX	and	Figure	25.
b. 9 thru 13 section boilers are shipped with the
proper	harness	length	suitable	for	a	13	section	
boiler.		For	boiler	sizes	9	thru	12,	modify	harness	
per	Table	IX,	also	refer	to	Figure	25.
c. 14 thru 18 section boilers are shipped with the
proper	harness	length	suitable	for	an	18	section	
boiler.		For	boiler	sizes	14	thru	17,	modify	
harness	per	Table	IX,	also	refer	to	Figure	25.	
Figure 5: Internal Wiring Harness - Length Adjustment for Penetration Through Side of Jacket Front Panel