Burnham MPC User Manual
Page 49
 
9
Figure : Install
nd
Pass Flueway Baffles
Figure : Install
rd
Pass Flueway Baffles (4 thru 11 Section Boilers Only)
2. On 4 thru 18 Section Boilers - Install four (4) second
pass baffles into second pass flueways until handle
is flush with face of casting as shown in Figure 33, 
Detail	A.
Lift	door	high	enough	to	move	hinge	pockets	through	
opening	in	jacket	front	panel.		Engage	hinge	loop	
attached	to	door	over	hinge	pin	attached	to	block	
assembly.		Lower	door	to	rest	weight	on	hinge	pin	
brackets.
M.
Locate Flueway Baffle Carton(s) marked ‘2FB’ and
‘3FB’ and remove contents. Check Equipment Check
List for proper baffle length and usage per boiler size.
1.	 On	4	thru	11	Section	Boilers	-	Install	four	(4)	third	
pass baffles into third pass flueways until handle is
flush with face of casting as shown in Figure 32, 
Detail	A.