Burnham V8 Series User Manual

Page 65

Advertising
background image

65

SECTION X: SYSTEM START-UP

e. Open purge valve.

f. Open shut-off valve in cold water supply piping

located between the air scoop and expansion
tank.

g. Allow water to overfl ow from bucket until

discharge from hose is bubble free for 30
seconds.

h. When zone valve is completely purged of air,

close zone valve or shut-off valve. Open zone
valve to the next zone to be purged. Repeat
this step until all zones have been purged. At
completion, open all zone valves.

i. Close purge valve, continue fi lling the system

until the pressure gauge reads 12 psi. Close shut-
off valve in cold water supply piping.

G

N

I

N

R

A

W

s

i

h

t

f

o

e

r

u

s

s

e

r

p

g

n

i

t

a

r

e

p

o

m

u

m

i

x

a

m

e

h

T

l

e

b

a

L

a

t

a

D

E

M

S

A

e

h

t

n

o

d

e

t

s

o

p

s

i

r

e

l

i

o

b

r

e

v

e

N

.

r

e

l

i

o

b

e

h

t

f

o

p

o

t

e

h

t

n

o

d

e

t

a

c

o

l

r

o

y

t

e

f

a

s

g

u

l

p

t

o

n

o

D

.

e

r

u

s

s

e

r

p

s

i

h

t

d

e

e

c

x

e

.

e

v

l

a

v

f

e

i

l

e

r

E

C

I

T

O

N

h

t

i

w

d

e

p

p

i

u

q

e

s

i

e

n

i

l

r

e

t

a

w

p

u

-

e

k

a

m

f

I

l

l

i

w

m

e

t

s

y

s

,

e

v

l

a

v

g

n

i

c

u

d

e

r

e

r

u

s

s

e

r

p

e

v

l

a

v

l

l

i

f

w

o

l

l

o

F

.

i

s

p

2

1

o

t

l

l

i

f

y

l

l

a

c

i

t

a

m

o

t

u

a

.

s

n

o

i

t

c

u

r

t

s

n

i

s

'

r

e

r

u

t

c

a

f

u

n

a

m

j. Open full port ball valve in boiler system piping.

k. Remove hose from purge valve.

l. Confi rm that the boiler and system have no water

leaks.

C. CHECK CONTROLS, WIRING AND

BURNER to be sure that all connections are tight and
burner is rigid, that all electrical connections have been
completed and fuses installed, and that oil tank is fi lled
and oil lines have been tested.

D. SET CONTROLS with burner service switch turned

“OFF”.

1. SET ROOM THERMOSTAT about 10° above

room temperature.

2. PRESS RED RESET BUTTON on front

of burner cover (or Primary Control for Carlin

A. ALWAYS INSPECT INSTALLATION

BEFORE STARTING BURNER.

1. Verify that the venting, water piping, oil piping, and

electrical system are installed properly. Refer to
Installation Instructions contained in this manual.

2. Confi rm all electrical, water and oil supplies are

turned off at the source and that the vent is clear
from obstructions.

G

N

I

N

R

A

W

l

l

a

w

o

l

l

o

f

d

n

a

d

n

a

t

s

r

e

d

n

u

,

d

a

e

r

y

l

e

t

e

l

p

m

o

C

e

r

o

f

e

b

l

a

u

n

a

m

s

i

h

t

n

i

s

n

o

i

t

c

u

r

t

s

n

i

.

p

u

t

r

a

t

s

g

n

i

t

p

m

e

t

t

a

B

.

FILL HEATING SYSTEM WITH WATER.

E

C

I

T

O

N

,

m

e

t

s

y

s

m

a

e

t

s

a

n

i

y

l

l

a

i

c

e

p

s

e

,

t

n

a

t

r

o

p

m

i

s

i

t

I

e

h

t

m

o

r

f

t

r

i

d

d

n

a

l

i

o

e

h

t

e

v

o

m

e

r

y

l

r

e

p

o

r

p

o

t

n

a

c

m

e

t

s

y

s

e

h

t

n

a

e

l

c

o

t

e

r

u

l

i

a

F

.

m

e

t

s

y

s

.

g

n

i

g

r

u

s

d

n

a

s

e

n

i

l

r

e

t

a

w

c

i

t

a

r

r

e

n

i

t

l

u

s

e

r

CLEAN HEATING SYSTEM if boiler water or
condensate return water is dirty or if erratic water lines
or surging exist after a few days of boiler operation.

Refer to Maintenance and Service Instructions Section
of this manual for proper cleaning instructions for
steam and water boilers.

1. STEAM BOILERS — Fill boiler to normal water

line. Refer to Figure No. 1D.

2. HOT WATER BOILERS. Fill entire heating

system with water and vent air from system. Use
the following procedure on a series loop or multi-
zoned system installed as per Figures 13A, 13B and
13C, to remove air from system when fi lling:
a. Close full port ball valve in boiler system piping.

b. Isolate all zones by closing zone valves or shut-

off valves in supply and return of each zone(s).

c. Attach a hose to vertical purge valve in boiler

system piping.

(Note - Terminate hose in fi ve gallon bucket at a
suitable fl oor drain or outdoor area).

d. Starting with one zone at a time, open zone valve

or shut-off valve in boiler supply and return
piping.

G

N

I

N

R

A

W

e

r

e

v

e

s

e

s

u

a

c

n

a

c

h

c

i

h

w

d

r

a

z

a

h

l

a

i

t

n

e

t

o

p

a

e

v

a

h

r

o

o

d

g

n

i

w

s

r

e

n

r

u

b

h

t

i

w

d

e

p

p

i

u

q

e

s

r

e

l

i

o

b

l

l

A

f

f

o

n

r

u

t

,

r

o

o

d

g

n

i

w

s

g

n

i

n

e

p

o

e

r

o

f

e

B

.

d

e

r

o

n

g

i

f

i

e

f

i

l

f

o

s

s

o

l

r

o

y

r

u

j

n

i

l

a

n

o

s

r

e

p

,

e

g

a

m

a

d

y

t

r

e

p

o

r

p

.

r

e

b

m

a

h

c

n

o

i

t

s

u

b

m

o

c

e

h

t

e

d

i

s

t

u

o

r

e

n

r

u

b

f

o

g

n

i

r

i

f

l

a

t

n

e

d

i

c

c

a

t

n

e

v

e

r

p

o

t

r

e

l

i

o

b

o

t

h

c

t

i

w

s

e

c

i

v

r

e

s

.

d

e

t

e

l

p

m

o

c

s

i

e

c

i

v

r

e

s

n

e

h

w

y

l

e

t

e

l

p

m

o

c

r

e

n

e

t

s

a

f

r

o

o

d

g

n

i

w

s

n

e

t

h

g

i

t

o

t

e

r

u

s

e

B

Advertising