SERVICE (cont.)

If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the
wiring diagram and check the dispenser wiring haness.

5. Reconnect the violet wire to terminal 1.
6. Carefully connect a piece of insulated jumper wire

to terminal 4. Keep the other end of this wire away
from any metal surface of the dispenser.

7. Check the voltage across terminals 1 & 3 with a

voltmeter. Connect the dispenser to the power
source. The indication must be 120 volts ac for two
wire 120 volt models, three wire 120/208 volt
models, three wire 120/240 volt models after a
delay of approximately 5 seconds.

8. Touch the free end of jumper wire to the compo-

nent bracket. The indication must be 0.

9. Move the jumper wire away from the component

bracket. The indication must again be 120 volts ac
for two wire 120 volt models, three wire 120/208
volt models , three wire 120/240 volt models after
a delay of approximately 5 seconds.

10. Disconnect the dispenser from the power source

and remove the jumper wire from terminal 4.

If voltage is present as described, the level control
board is operating properly, proceed to #11.
If voltage is not present as described, replace the level
control board.

11. Reconnect the pink wire to terminal 4.
12. Gently pull the probe out of the tank lid and inspect

for corrosion. Replace it if necessary.

13. Place the probe so that neither end is in contact

with any metal surface of the dispenser.

14. Check the voltage across terminals 1 & 3 with a

voltmeter. Connect the dispenser to the power
source. The indication must be 120 volts ac for two
wire 120 volt models, three wire 120/208 volt
models, three wire 120/240 volt models and 240
volts ac for two wire 240 volt models after a delay
of approximately 5 seconds.

15. Move the probe's flat end to the tank. The indica-

tion must be 0.

16. Move the probe's flat end away from the tank. The

indication should again be 120 volts ac for two

LEVEL CONTROL BOARD AND LEVEL PROBE
(cont.)

wire 120 volt models, three wire 120/208 volt
models, three wire 120/240 volt models after a
delay of approximately 5 seconds.

If voltage is present as described, reinstall the probe,
the level control board and level probe are operating
properly.
If voltage is not present as described, check the pink
probe wire for continuity.

Removal and Replacement:
1. Remove all wires from the level control board.
2. Remove two #8-32 keps nuts holding level control

board to right side of the component bracket.

3. Remove level control board and spacers.
3. Install the new level control board and spacers to

the right side of the component bracket using two
#8-32 keps nuts.

4. Refer to Fig. 17 when reconnecting the wires.

P1455

FIG. 17 LEVEL BOARD TERMINALS

T1 VIO to Inlet
Solenoid Coil

T2 BLU to Overflow
Protection Switch

T3 WHI to Main
Harness

T4 PNK to Probe

GRN to Tank