3 installing the air locker, Drilling and tapping the bulkhead port – ARB RD139 User Manual

Page 12

Advertising
background image

3 Installing the Air Locker

10


Figure 4.

















3.2

Drilling and Tapping the Bulkhead Port

An air line port must be drilled and tapped through the differential
housing to mount the bulkhead fitting into.

!

Mark a spot on the top of the outside of the differential housing that

will be clear of the Air Locker once the seal housing tube has been
installed. (Fig.5.)


Figure 5.











Advertising