3 installing the air locker, Setting up the bulkhead fitting – ARB RD139 User Manual

Page 17

Advertising
background image

3 Installing the Air Locker

15

3.6

Setting up the Bulkhead Fitting

!

Apply thread sealant to the threads of the bulkhead body.

!

Screw the bulkhead body into the tapped hole, and tighten.

!

Wipe the area clean of any excess thread sealant (inside and

outside of the housing).

!

Without using sharp, jagged tools such as pliers (your hands are

the best tool for this job), bend the seal housing tube to
approximate the finished profile. This will allow the tube to be
trimmed to a length that would allow it to protrude from the
bulkhead fitting. (Fig. 9.)

NOTE : Use an automotive brake line tubing cutter to cut the

seal housing tube, never a hacksaw as this will leave
metal filings in the air system.

Figure 9.















!

From the inside of the housing, insert the trimmed tube into the

bulkhead.

!

From the outside of the housing, assemble the small O-ring over

the top of the short length of seal housing tube protruding through
the bulkhead fitting.

!

While holding the seal housing tube into the bulkhead fitting, insert

the small drilled end of the center compression nut over the
extended tube as shown in the assembly diagram (Fig.10.), and
screw it into the bulkhead body, and lightly tighten.


Advertising