3 installing the air locker, Pre-load shimming, Pre-loading an aluminum housing – ARB RD100 User Manual

Page 22

Advertising
background image

3 Installing the Air Locker

20

3.7

Pre-Load Shimming

In order to pre-load the tapered roller bearings in your Air Locker,
measurements need to be taken so that a value can be calculated for
the shim thickness ‘D’ in Figure 13.

3.7.1

A

Pre-Loading an Aluminum Housing

c Grind or cut a notch into the left-hand factory shim as clearance for

the seal housing tube at final assembly. Figure 14. shows the
desired size of the notch.

Figure 14.

c Remove any sharp or protruding edges from around the notch.
c While holding the right-hand bearing cup in place, insert and hold

the Air Locker into the differential housing.

c Insert one of the two master shims from the Air Locker shim kit

between the right-hand bearing cup and the bearing seat of the
axle housing with the rounded edge of the master shim facing away
from the center.

c Insert the shim pack determined earlier as ‘B’ between the bearing

cup (right-hand side) and the master shim.

c Insert the original factory shims in their original positions on both

sides.

c Push (or lightly pry) the Air Locker hard across to the right-hand

side, and measure the maximum gap (also called the ‘end float’)
between the left-hand factory shim and the seal housing with an
automotive feeler gauge. (Fig.15.)

Advertising