Pre-load + end float = shim pack, 3 installing the air locker, Pre-loading a live axle housing – ARB RD100 User Manual

Page 25

Advertising
background image

3 Installing the Air Locker

23

3.7.2

B

Pre-Loading a Live Axle Housing

c Insert and hold the Air Locker into the differential housing.
c Insert the remaining master shim from the Air Locker shim kit

between the right-hand bearing cup and the bearing seat of the
axle housing with the rounded edge of the master shim facing away
from the center.

c Insert the shim pack determined earlier as ‘B’ between the bearing

cup (right-hand side) and the master shim.

c Push (or lightly pry) the Air Locker hard across to the right-hand

side, and measure the maximum gap (also called the ‘end float’)
between the outside of the seal housing and the inside face of the
axle housing with an automotive feeler gauge. (Fig.18.)

Figure 18.


c Consult your vehicle manufacturer’s service manual to determine

the carrier bearing pre-load amount specified for your vehicle.

c Add the specified pre-load amount to the measurement taken with

the feeler gauge to determine a shim amount for ‘D’ in Figure 13.

PRE-LOAD + END FLOAT = SHIM PACK

c Create a shim pack ‘D’ from the shims supplied with your Air

Locker.

NOTE : Do not add shims between the bearing cone and the

bearing seat and NEVER machine the Air Locker.

c Remove the Air Locker from the axle housing.

Advertising