4 installing the air system, Connection to the bulkhead fitting – ARB RD138 User Manual

Page 29

Advertising
background image

4 Installing the Air System

27

NOTE :

To remove the air line from the push-in fitting; pull
outward on the flange of the fitting, push the air line
as far into the fitting as possible and hold, push
inward on the flange, and then pull the air line free of
the fitting.


4.3

Connection to the Bulkhead Fitting

c Trim the air line to length using a sharp knife.
c Insert the support spring over the end of the air line - small end first.

(Fig.21.)

c Insert the outer compression nut over the air line.
c Insert the 5mm [0.197”] ferrule over the end of the air line. Leave

approx. 5mm of tubing between the ferrule and the end of the tube.


Figure 21.
















c Insert the support tube all the way into the end of the air line.

Advertising