ARB RD138 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing of the Axles and Differential

5

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

3 Installing the Air Locker

9

3.1 Mounting the Ring Gear

9

3.2 Installing the Carrier Bearings

10

3.3 Drilling and Tapping the Bulkhead Port

11

3.4 Final Air Locker Assembly

12

3.5 Checking the Backlash

14

3.6 Installing the Seal Housing

15

3.7 Setting up the Bulkhead Fitting

17

3.8 Profiling the Seal Housing Tube

20

3.9 Bench Testing the Air Locker

22

3.10 Reinstalling the Differential & Axles

23

4 Installing the Air System

24

4.1 Mounting the Solenoid

24

4.2 Running & Securing the Air Line

26

4.3 Connection to the Bulkhead Fitting

27

5 Mounting & Connecting the Electrical System

29

5.1 Mounting the Actuator Switch(es)

29

5.2 Wiring the Actuator System

30

6 Testing & Final Assembly

33

6.1 Leak Testing

33

6.2 Testing the Air Locker Actuation

33

6.3 Filling the Differential

34

6.4 Post-Installation Check List

35

7 Parts List

37

7.1 Exploded Assembly Diagram

37

7.2 Itemized Parts List

38

Advertising