3 Installing the Air Locker
10
Figure 4.
3.2
Installing the Carrier Bearings
Apply a thin film of high pressure grease to the bearing journals of
the Air Locker, then press the bearing cones onto the bearing journals as shown in figure 5.
Figure 5.