ARB RD74 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

5

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

3 Installing the Air Locker

9

3.1 Mounting the Ring Gear

9

3.2 Installing the Carrier Bearings

10

3.3 Drilling and Tapping the Bulkhead Port

11

3.4 Final Air Locker Assembly

12

3.5 Checking the Backlash

13

3.6 Installing the Seal Housing

14

3.7 Setting up the Bulkhead Fitting

15

3.8 Profiling the Seal Housing Tube

18

3.9 Bench Testing the Air Locker

20

3.10 Reinstalling the Differential & Axles

21

4 Installing the Air System

22

4.1 Mounting the Solenoid

22

4.2 Running & Securing the Air Line

24

4.3 Connection to the Bulkhead Fitting

25

5 Mounting & Connecting the Electrical System

26

5.1 Mounting the Actuator Switch(es)

26

5.2 Wiring the Actuator System

27

6 Testing & Final Assembly

30

6.1 Leak Testing

30

6.2 Testing the Air Locker Actuation

30

6.3 Filling the Differential

31

6.4 Post-Installation Check List

32

7 Parts List

33

7.1 Exploded Assembly Diagram

33

7.2 Itemized Parts List

34

Advertising