4 installing the air system, Connection to the bulkhead fitting – ARB RD74 User Manual

Page 27

Advertising
background image

4 Installing the Air System

25


4.3

Connection to the Bulkhead Fitting

Trim the air line to length using a sharp knife.
Insert the support spring over the end of the air line - small end first.

(Fig.18.)

Insert the outer compression nut over the air line.
Insert the 5mm [0.197”] ferrule over the end of the air line. Leave

approx. 5mm of tubing between the ferrule and the end of the tube.

Figure 18.















Insert the support tube all the way into the end of the air line.

HINT :

If the support tube is too difficult to insert, place the
end of the air line into a cup of boiled water to soften
the tubing.

Insert the tube end all the way into the center compression nut.
Screw on the outer compression nut and tighten. The ferrule and

support tube are now permanently attached.

Assemble the support spring over the outside of the outer

compression nut.

Secure any loose sections of tube with a cable tie.

Advertising