Fitting procedure – ARB 3410100 User Manual

Page 6

Advertising
background image


FITTING PROCEDURE

7. Using a 12mm drill bit, drill two new

holes in the roller fairlead 20mm below
the original holes.

8. Fit the roller fairlead to the bar using

two 3/8” x 1 ¾” bolts, M10 flat and
spring washers. Tighten all winch bolts.

9. Fit the control box to the control box

bracket using the nuts and washers that
came with the winch kit.

10. Wire the control box to the winch

according to the instructions provided
with the winch.

Original

New hole

Drill the new
hole 20mm
below original

Last Rev Date: 26/05/2006

Page 6 of 9

Fitting instructions# 3783204

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

Advertising