JB Conversions 2308 Dana 300 User Manual

Page 20

Advertising
background image

20

33) Install the yoke, rubber nut seal, and lock nut. Torque to #180 lb-ft

(Fig.40). Discard setup nut used in step 16.

FIG: 40

34) Remove the input retainer assembly you installed temporarily in step 15

(Fig.41).

FIG: 41

35) If you have left the slider ring, forks, and shift tower assembly in place

(from step #6) throughout this reassembly, apply RTV to the back of the

input retainer assembly and reinstall it. If you have removed the slider ring

Advertising