Synergy 8020-20/8040-20 - Jeep JK 2 User Manual
Page 14
Advertising
35) On 2012+ models, be sure to reinstall the brake line attachment bolt at the coil spring which was
removed in step 25. Torque to 10 ft-lbs.
36) Reinstall tires and lower to ground. Torque wheels to manufacturers recommended specifications.
37) Reinstall front track bar bolt removed in step 21 and torque to 125 ft-lbs.
It helps to have someone turn the steering wheels to help align the bushing to the bracket
hole when inserting the bolt.
38) Installation is complete. Recheck all bolt torques after 100 miles of driving or any significant off-road
use.
Advertising