5 lsi-can check pt, Lsi-can check pt, R to section 9.11.5, “lsi-can check pt – JLG G5-18A Service Manual User Manual
Page 151
 
9-31
G5-18A, 2505H, 25.5
Electrical System
8. Press the SYSTEM CHECK button on the LSI
display and release. As the calibration point is 
recorded, buzzer sounds and the LEDs will flash and 
perform a sequence until all are flashing.
9. Perform the LSI- CAN Check PT to finalize the
calibration. Refer to Section 9.11.5, “LSI-CAN Check 
PT.”
Note: The following procedure MUST BE performed to 
finalize the LSI System Calibration.
9.11.5
LSI-CAN Check PT
With the LSI calibrated, the UGM also needs calibrated 
and verified. 
1. The machine must be on a level surface, wheels
steered straight and park brake ON.
2. Connect the analyzer cable connector to the
connector at the right rear corner of the cab by the 
operator seat.
3. Start the machine.
4. Press the “C” and “OK” buttons simultaneously on
the analyzer.
5. Go to “ACCESS LEVEL 3” and press “OK”.
6. Enter the proper access code and press “OK”.
7. “ACCESS LEVEL 2” is now visible.
8. Go to “CALIBRATIONS” menu, press “OK”.
9. Scroll to “LSI_CAN CHECK PT”.
10. “SET LSI_CAN CHECK POINT”, use the arrow keys
to change “NO” to “YES”.
11. Follow and execute the screen instructions:
a. “Remove Weights and Attachments”, press “OK”.
b. “TELESCOPE IN and FULLY LIFT UP”, press
“OK”.
c. “STOP, WAIT ONE MINUTE”, wait at least one
minute and press “OK”.
d. “PRESS ENTER TO SET CHECK POINT”, press
“OK”
e. Screen defaults back to “CALIBRATIONS:
LSI_CAN CHECK POINT”.
f. Press “C” for approximate two seconds to return
to normal display screen.
g. LSI Can Check is now complete.
12. Remove the analyzer.
13. Return machine to service.