Storage position, 11 lifting and tie down, Lifting – JLG 340AJ Operator Manual User Manual

Page 62: Tie down, Storage position -14, 10 lifting and tie down -14, Lifting -14 tie down -14

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121258

Storage Position

(See Figure 4-5.)

The procedures to place the machine in the storage position
is as follows:

1. From the ground control station, raise the boom at least

to the elevation shown in Figure 4-5. The boom must be
raised to prevent the platform basket from hitting the
ground during this procedure.

THE JLG CONTROL SYSTEM WILL SET A DIAGNOSTIC TROUBLE CODE
TO SIGNIFY THE JIB IS BEING PLACED IN THE STORAGE POSITION.

2. Using the jib lift control, lower the jib until the platform is

in the position shown.

THE PLATFORM BASKET MUST NOT BE IN CONTACT WITH THE
GROUND, BLOCKING, OR ANY TIE DOWN EQUIPMENT.

3. Place blocking under the platform support, lower the

platform support down onto the blocking, and tie it
down as shown in Figure 4-5.

4.11 LIFTING AND TIE DOWN

(See Figure 4-6.)

Lifting

1. Refer to the Serial Number Plate, refer to the Specifica-

tions section of this manual, or weigh the individual unit
to find out the Gross Vehicle Weight.

2. Place the boom in the stowed position.

3. Remove all loose items from the machine.

4. Properly adjust the rigging to prevent damage to the

machine and so the machine remains level.

Tie Down

WHEN TRANSPORTING THE MACHINE IN THE STOWED POSITION, THE
BOOM MUST BE FULLY LOWERED INTO THE BOOM REST.

1. Place the boom in the stowed position or storage posi-

tion.

2. Remove all loose items from the machine.

3. Secure the chassis and the platform using straps or

chains of adequate strength.

Advertising