28 wheel torque chart -39 – JLG 510AJ Operator Manual User Manual

Page 121

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

3121179

– JLG Lift –

6-39

2. Tighten nuts in the following sequence:

3. The tightening of the nuts should be done in stages. Fol-

lowing the recommended sequence, tighten nuts per
wheel torque chart.

4. Wheel nuts should be torqued after first 50 hours of

operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.

Table 6-28. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

40 ft. lbs.

(55 Nm)

100 ft. lbs.

(130 Nm)

170 ft. lbs.

(255 Nm)

Advertising
This manual is related to the following products: