NOTE: NUMEROUS COMPONENTS SHOWN
TRANSPARENT FOR ROUTING CLARITY
SEE DETAIL
F
SEE DETAIL
D
SEE DETAIL
H
SEE DETAIL
E
ROUTE HOSES/ CABLES
THROUGH GUIDE ROD
ON BASE BOOM
ROUTE HOSES/ CABLES
THROUGH GUIDE ROD
ON FLY BOOM
LOWER UPRIGHT
UPPER UPRIGHT
DETAIL
H
HOSE AND CABLE ROUTING
INTO LOWER BOOM
MEASURE LOWER BOOM
PULL LENGTHS FROM HERE
USE CABLE TIE IN
TURNTABLE AREA EVERY
200-250mm. USE CABLE
TIES AS REQUIRED
DETAIL
E
50
12
MAINTAIN HOSE/
CABLE LOOP AT
THIS DIMENSION
FROM
CYLINDER
ENDCAP
110
10
DETAIL
D
JIB LINK CUT AWAY
DETAIL
F
TOWER LIFT CYLINDER
PRESSURE AND TANK
HOSES AND HARNESS
SPLIT OFF FROM MAIN
BUNDLE IN THIS AREA
ROUTE HOSES/
CABLES THROUGH
(3) GUIDE RODS
IN UPRIGHT
HOSES AND CABLES SHOULD BE AGAINST
THE OUTSIDE RADIUS OF THE POWER TRACK
HOSES AND CABLES SHOULD NOT BE
PULLED TIGHT AGAINST THE INSIDE
RADIUS OF THE POWERTRACK
INCORRECT
CORRECT
Figure 3-41. Cable Installation and Identification - Sheet 3 of 8