SECTION 3 - CHASSIS & TURNTABLE

3121234

– JLG Lift –

3-63

Oscillating Axle Lockout Test

LOCKOUT SYSTEM TEST MUST BE PERFORMED QUARTERLY,
ANY TIME A SYSTEM COMPONENT IS REPLACED, OR WHEN
IMPROPER SYSTEM OPERATION IS SUSPECTED.

NOTE: Ensure boom is fully retracted, lowered, and cen-

tered between drive wheels prior to beginning lock-
out cylinder test.

1. Place a 6 inch (15.2 cm) high block with ascension

ramp in front of left front wheel.

2. From platform control station, activate machine

hydraulic system.

3. Place FUNCTION SPEED CONTROL and DRIVE

SPEED/TORQUE SELECT control switches to their
respective LOW positions.

4. Place DRIVE control lever to FORWARD position

and carefully drive machine up ascension ramp until
left front wheel is on top of block.

5. Carefully activate SWING control lever and position

boom over right side of machine.

6. With boom over right side of machine, place DRIVE

control lever to REVERSE and drive machine off of
block and ramp.

7. Have an assistant check to see that left front wheel

remains locked in position off of ground.

8. Carefully activate SWING control lever and return

boom to stowed position (centered between drive
wheels). When boom reaches center, stowed posi-
tion, lockout cylinders should release and allow
wheel to rest on ground, it may be necessary acti-
vate DRIVE to release cylinders.

9. Place the 6 inch (15.2 cm) high block with ascension

ramp in front of right front wheel.

10. Place DRIVE control lever to FORWARD and care-

fully drive machine up ascension ramp until right
front wheel is on top of block.

11. Carefully activate SWING control lever and position

boom over left side of machine.

12. With boom over left side of machine, place DRIVE

control lever to REVERSE and drive machine off of
block and ramp.

13. Have an assistant check to see that right front wheel

remains locked in position off of ground.

14. Carefully activate SWING control lever and return

boom to stowed position (centered between drive
wheels). When boom reaches center, stowed posi-
tion, lockout cylinders should release and allow
wheel to rest on ground, it may be necessary acti-
vate DRIVE to release cylinders.

15. If lockout cylinders do not function properly, have

qualified personnel correct the malfunction prior to
any further operation.