Section 4. boom & platform, 1 boom maintenance, Removal – JLG 680S Service Manual User Manual

Page 195: Section 4 - boom & platform, Boom maintenance -1, Removal -1, Location of components - platform support -1, 1 boom maintenance removal

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121234

– JLG Lift –

4-1

SECTION 4. BOOM & PLATFORM

4.1 BOOM MAINTENANCE

Removal

1. Remove the platform/support as follows:

a. Disconnect electrical cable from control con-

sole.

b. Remove the eight (8) bolts securing the platform

to the platform support, then remove the plat-
form.

c. Using an overhead crane or suitable lifting

device, strap support the platform support.

d. Remove the six (6) bolts and locknuts securing

the support to the rotator.

e. Using a suitable brass drift and hammer, remove

the rotator shaft, then remove the support from
the rotator.

2. Remove the rotator and slave level cylinder from the

fly boom as follows:

a. Tag and disconnect hydraulic lines to rotator.

Use suitable container to retain any residual
hydraulic fluid. Cap hydraulic lines and ports.

b. Remove hardware from pin #1. Using a suitable

brass drift and hammer remove pin #1 from the
fly boom.

c. Supporting the rotator, remove the hardware

from pin #2. Using a suitable brass drift and
hammer, remove pin #2 from the fly boom and
remove the rotator.

d. Telescope the fly section out approximately 20

inches (50.8 cm) to gain access to the leveling
cylinder.

e. Supporting the cylinder, remove the hardware

from pin #3. Using a suitable brass drift and
hammer remove pin #3 from the fly boom.

f. Tag and disconnect hydraulic lines to the level-

ing cylinder. Use a suitable container to retain
any residual hydraulic fluid. Cap hydraulic lines
and ports. Remove the leveling cylinder.

3. Remove the powertrack from the boom as follows:

a. Disconnect wiring harness from ground control

box.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID ENTRY OF
CONTAMINANTS INTO SYSTEM.

b. Tag and disconnect hydraulic lines from boom

to control valve. Use a suitable container to
retain any residual hydraulic fluid. Cap hydraulic
lines and ports.

c. Disconnect the dual capacity indicator limit

switch from side of boom section.

d. Remove hydraulic lines and electrical cables

from powertrack.

e. Using a suitable lifting equipment, adequately

support powertrack weight along entire length.

f. Remove bolts #1 securing the push tube on the

fly boom section.

g. Remove bolts #2 securing the push tube on the

mid boom section.

Figure 4-1. Location of Components - Platform Support

Figure 4-2. Location of Components - Rotator and

Leveling Cylinder

Advertising