JLG 40xxPS Operator Manual User Manual
Page 97
Advertising

Section 5 - Attachments and Hitches
5-17
31200205
This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-3.
1. Tilt quick attach forward to provide clearance.
Check to be sure lock pin is out.
2. Align attachment pin recess with attachment pin.
Raise boom slightly to engage attachment pin in
recess.
3. Tilt quick attach back to engage attachment.
4. Insert lock pin and secure with retainer pin.
5. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic
Operated Attachment” on page 5-18.
OZ3620
OZ3630
OZ3640
OZ3650
Advertising
This manual is related to the following products: